Sliding Contact Line Installation Engineering Acceptance Standard - Yangzhou Darui



Darui Electric recommends for you

For the basic items of the safety sliding contact line installation completion acceptance, a gap of 10-20mm should be left at the deformation joint and maintenance section, the end of the safety sliding contact line should be smooth, and the height difference between the two ends should not be greater than 1mm. The sag deviation between freely suspended sliding contact lines should not be greater than 20mm. For parts painted with paint or color paint, the color should be correct without missing brush. The indicator light should indicate normally.



 



Safety sliding contact line sliding contactor should slide smoothly throughout the full stroke without large sparks, and observe or check the installation trial operation records. The installation of soft cables should comply with the following regulations: the terminal fixation of the soft cable slideway and traction rope should be reliable, and the slideway adjustment device should be complete. The safety sliding contact line soft cable should slide flexibly and smoothly along the slideway, without twisting or jamming. The length of the cable moving section should be 15% to 20% longer than the moving distance of the crane, and when the moving length exceeds 20m, a traction rope should be added. The anti-corrosion of metal parts should be uniform without omission. Inspection method for safety sliding contact line: observe and check or view the trial operation records.



 



The sliding contactor should be installed flat and firmly, with smooth sliding contact surface and good contact. The center of the sliding contactor should not exceed the edge of the sliding contact line during sliding. The slider should be flexible without jamming, and the insulation parts should be complete. Observe and check during trial operation. The metal frame of the safety sliding contact line with a height below 3.5m should be reliably grounded, and the cross-section of the grounding wire should be correctly selected. The grounding wire should have no missing connections. Observe and check. Trial operation and acceptance items for safety sliding contact line: after the installation of the safety sliding contact line and soft wires is completed, check and clean them, use a megger to measure the insulation resistance between phases and to ground, the resistance value should be greater than 0.5MΩ. And make a record.





The sliding contactor should be installed firmly according to the product regulations, and slide reliably along the safety sliding contact line. At any position, the centerline of the sliding contactor should not exceed the edge of the sliding contact line. After the detection meets the requirements, power on for no-load operation. After checking that there are no abnormal phenomena, then run with load. After the safety sliding contact line sliding contactor slides smoothly with the sliding contact line throughout the entire stroke during operation, without large sparks and abnormal phenomena, hand it over to the construction unit for use.









Note: The above information and technical parameters are compiled and released by Yangzhou Darui Electric Co., Ltd.